Snow is coming to New England this weekend so we wanted to get the control cables run to our new EME Tower before the ground is covered with snow. The project involved installing a Utility Enclosure…
Source: EME Station 2.0 Part 5 – Control Cables and Rotator Controller
We made some more progress on our 2m EME Station Project this past weekend. We began by installing a Utility Controller on our new EME Tower. With this done, we next ran three control cables through the conduits between our shack and the Tower. The control cables connect to our Azimuth Rotator, Elevation Rotator, and a planned MAP65 Switching and Preamp System.

With the cables run, we connected our Azimuth Rotator to a Green Heron Az/El Rotator Controller in our shack. This enabled us to get our Azimuth Rotator configured and tested.
You can read more about this part of our EME Station Project via the link above.
The next step in our EME Station Project will be to assemble the antennas that we have on order from M2 Antennas Systems and install them along with an H-Frame and related gear on our new Tower. We are hoping that the winter weather will allow us to get this done before spring.
Fred, AB1OC